
Intellislope Grade Control by Ag Leader.
DIY Tile Drainage with Confidence.
Three Easy Steps
-
Survey
Collect a survey of the surface elevation by driving over the path either ahead of time or right before your tile drainage installation.
-
Plan
Enter parameters to ensure drainage tile is placed as desired in field or import a complete tile drainage plan from SMS Advanced.
-
Install
Let Ag Leader’s Intellislope do the work of precise grade control of the tile plow.
The AutoTile mode will automatically adjust depth of the tile plow or you can use manual grade and pitch control modes.
Worry-Free Grade and Pitch Control
Automated grade calculations with AutoTile
AutoTile mode makes grade calculations based on the survey and target elevation and automatically adjusts the depth of the tile plow.
Flexibility to adjust as you go
If you want more control, grade control mode uses GPS instead of complicated lasers to install at the desired grade. Grade settings can easily be manually adjusted as you go from the cab instead of a laser tripod. If needed, you can also use grade breaks to shallow up but keep the same grade.
Automated pitch control if signal is lost
If your RTK GPS signal is lost, use Pitch Control mode to finish the run. This mode is intended to keep you at your desired pitch in case of a lost signal but is not meant for large-scale installations.